We propose
Unified Monitoring Center for Construction Sector
Main directions
Monitoring the progress of construction projects
Identifying hazards at construction sites
Monitoring compliance with safety regulations by personnel
Monitoring the movement and consumption of materials
Monitoring labor efficiency of workers
Monitoring the operation of construction equipment
Real-time 24/7 Site Observation
Photo and video documentation using
Video cameras
Drones
Smartwatches
Access control systems
When threats or deviations are detected, a warning or alarm is sent to the information system
  • Construction volume control
    Monitoring the amount of construction completed
  • Construction pace control
    Monitoring the speed of construction
  • External works control
    Monitoring outdoor construction activities
  • BIM model compliance assessment
    Evaluating process conformity to the BIM model
  • Notification of responsible persons about deviations
    Alerting relevant staff about anomalies
  • Forecasting project completion based on all data
    Predicting construction completion date using data analysis

Сontrol of material movement and consumption

  • Monitoring equipment arrival

  • License plate and vehicle type recognition, cargo recognition

  • Monitoring removal of cargo

  • Forecasting shortages or overuse of construction materials

  • Detection of defects in construction materials

Personnel Control
  • Safety compliance monitoring
  • Monitoring use of personal protective equipment (PPE)
  • Tracking personnel count, evaluating staff performance
  • Body temperature monitoring
  • Face recognition, cross-checking with database, detecting unauthorized persons on site
  • Recording worker downtime
Site safety control
  • Detection and documentation of safety violations
  • Predicting equipment failures
  • Warnings about adverse weather conditions
  • Warnings about flammable materials, speeding, improper equipment parking
  • Fire safety threat detection
  • Quality inspection of scaffold assembly using neural networks and previous experience
  • Risk forecasting and automation of standard operations
  • Recording crane operation time per shift
  • Recording number of cycles per shift
  • Recording mass of moved cargo
  • Monitoring electricity consumption
  • Recording downtime
  • Forecasting time to resume work after bad weather
Results
Reduce construction time by 2 months
Lower costs
Ensure safety
System payback period no more than 2 years
Our monitoring system is already observing and detecting